Add: 1 Xinmao Road, Beibei district, Chongqing, China
+86 17815389416
   Home > Products > Vacuum Pump System > VPS Transformer Evacuation Systems For T

Vacuum Pump System

  • VPS Transformer Evacuation Systems For Transformer Drying
  • VPS Transformer Evacuation Systems For Transformer Drying
  • VPS Transformer Evacuation Systems For Transformer Drying
  • VPS Transformer Evacuation Systems For Transformer Drying
VPS Transformer Evacuation Systems For Transformer DryingVPS Transformer Evacuation Systems For Transformer DryingVPS Transformer Evacuation Systems For Transformer DryingVPS Transformer Evacuation Systems For Transformer Drying

VPS Transformer Evacuation Systems For Transformer Drying

  • Category: Vacuum Pump System
  • Views:4858
  • Product Origin: CHINA
  • Model: VPS (double-stage)
  • Pumping speed: 108~4320 m3/h
  • Lead time: 15 ~ 20 Days
  • Product description:VPS Transformer Evacuation Systems For Transformer Drying is designed to dry the inner parts of transformer, and keep good insulation of the inside party before putting into use.
  • INQUIRY  


Description | Transformer Evacuation Systems for Transformer Drying

VPS Transformer Evacuation Systems for transformer drying adopts double-stage / three stage vacuum pumps, designed for drying the inner parts of transformer and ensure the good insulation before putting into use.

1) Vacuum Drying of Transformer. It will suction air from transformer body, and form vacuum inside the transformer body, aiming to remove moisture and gas from inner tank and insulating material.

2) Vacuum Oiling. It will work together with transformer Oil Purification Machine when doing maintenance and repair. After the vacuum drying of transformer is completed, transformer oil being purified and filled into transformers.

3) Provide Stronger Vacuum for Transformer Oil Degassing. When dewatering and degassing transformer oil of high voltage such as 1000KV, it's better to connect the vacuum pumping unit with Transformer Oil Purification machine to achieve a higher efficiency.

This standard VPS High Vacuum Pumping Unit is mainly consists of double-stage or three-stage vacuum pumps (rotary vane vacuum pump and roots booster pump), digital vacuum gauge, vacuum chamber, eletrical control cabinet. It enables the working vacuum degree to 10 Pa and limit vacuum degree to 1 Pa.

Features | Transformer Evacuation Systems for Transformer Drying

transformer evacuation systems for transformer drying• Digital vacuum gauge to indicate the working condition and monitor the performance.

• Strong, stable and reliable vacuum generated, no leaks.

Vacuum pumping units with various pumping rate of 108~6480 m3/h. (two or three stage vacuum pumps)

• Quick start, easy operation, simple structure.

Weather-proof enclosure is optional.

• PLC automatic control and Fully touch screen is optional.


          •         a) This picture displayed shows the model VPS-1200 (pumping speed: 4320 m3/h);
  •         b) It adopts two rotary vane vacuum pumps as the backing pump, and one roots booster vacuum pump as the main pump;
  •         c) Its vacuum limit can reach the value of less than 1 pa.
  •         d) It is equipped with Pirani vacuum gauge for more accurate monitoring;
  •         e) Based on user's requirements, some optional accessories can be addes such as weatherproof housing, PLC automatic control, etc.


Technical Parameters | Transformer Evacuation Systems for Transformer Drying

Item Unit VPS-30 VPS-70 VPS-150 VPS-300 VPS-600 VPS-900 VPS-1200
Pumping speed m3/hour 108 252 540 1080 2160 3240 4320
Ultimate vacuum degree Pa ≤ 3
1
Pumping stage
2 3
Power supply 380Volts, 50Hz, 3Phase (Or customized)
Total power kw 3 4 5 7 8 13 18.5
Air inlet diameter mm 25 25 40 50 65 65 80
Size Length mm 900 1000 1100 1200 1500 1800 2000
Width mm 800 800 800 900 1000 1200 1500
Height mm 1200 1200 1200 1500 1500 1600 1800
Weight kg 450 550 600 900 950 1200 1500

* OPTIONAL CONFIGURATIONS: PLC automatic control system, Fully-Touch Screen, Weather-proof Enclosure, etc.

* The machine size and weight will change slightly due to different configurations.


After-Sales Service

12 months of quality guarantee for non-human damage.

Lifelong maintenance and spare parts supply.

Free training on operation, maintenance and troubleshooting at PureTech factory.

Puretech engineers go to customer site for commissioning and training (payable service).

• Design accept user's customization.